The client Bawe/MIP the problem Carvida fishing vessel required insulation of the ice room where fish are boxed and stored after catching. Excessive condensation and high energy costs for refrigeration were also important issues. the solution The walls and ceiling of the 12x x 7m room were lined with timber and the floor concreted. LD40…
The Problem: The old slate roof over the hospital wards was suffering from nail fatigue and was beginning to require regular costly maintenance. Loose powdery torchings on the back of the slates were constantly falling onto the ceilings of the wards creating dusty, unhygenic conditions and compacting the loft insulation. The Solution: The loose torchings…
Client: Marriott Joinery. Boat mooring at Chapel Farm Marina, Shardlow, Derbyshire Problem: To insulate the Mesopotamia (57’ x 6’). Narrow boats are very difficult to insulate using more traditional methods, due to the shape of the interior of the hull. The risk of gaps, separation of insulation from the substrate and condensation are high with…
The Problem Novel techniques were required to create a 300m² restaurant complex roof in the this prestigious North Belgium theme park. It was essential that the roof structure was waterproofed and the complex design required a re-think to the originally considered sheet membrane waterproofing. the solution To create the complex toadstool shape, polyurethane rigid foam…
Client: Barn conversion contractor: conversion of 6 solid wall barns at Lavant Problem: Solid wall construction did not meet Building Regulations Part L requirements. The property could not be externally clad as the external appearance could not be changed due to Planning Regulations. Using conventional insulation products on the inner wall to achieve U values…
Client: A Major Boat Builder Applicator: Websters Insulation Limited. Problem: Insulation of a steel-hulled ship, which required a high insulation value and rapid application to achieve a deadline for the client. Only polyurethane foam could achieve the insulation value required at the thickness specified, but the project deadline required that the application be spray applied…
The client Blackburn with Darwen Council The problem A wide variety of houses built in the early 1900’s with variable width cavities which could not be insulated with standard products Structural problems caused by failing wall-ties due to water penetration into the cavity and properties in areas exposed to wind driven rain. the solution Technitherm…
the client Liverpool Housing Trust the problem When gale force winds ripped the brick cladding from a 1960’s tower block, immediate action was called for. Several more blocks were surveyed and it was revealed that 70% of the wall ties were missing, causing a serious safety hazard. the solution The structural adhesive properties of Technitherm…
Client: Davyhulme WWTW Applicator: Sureseal Limited Problem: Insulation required to 8 tank tops, approximately 500m2 each, over a 3-year period with each tank being made available at fairly short notice and at different times of the year, which resulted in some of the tanks being sprayed in the winter months. This created the problem of…
The client Quay Marinas Ltd the problem A 25 metre long tidal control gate was internally waterlogged due to the original installed open cell foam absorbing water from a small leak. This prevented the gate operating correctly. the solution The gate was removed from the water. The waterlogged foam was removed and the tube fully…
Tel: +44 (0)1254 872555Email: info@isothane.com
Tel: +44 (0)1254 872555Email: sales@isothane.com
Tel: +44 (0)1254 872555Email: technical@isothane.com
Tel: +44 (0)1254 872555Email: international@isothane.com
Enter your email to receive latest newsletters and industry updates
This website uses Cookies to improve your browsing experience. View Cookies Policy
I'm fine with this