HOME || CONTACT US || LINKS || SITE INDEX || STIRLINGLLOYD GROUP

News 17/03/09


 News

Duratherm® stabilises
   Waste Transfer Station
   roof

   
Insulation &
   Stabilisation with
   Technitherm®

   
Isothane launch the
   Quality Installer Scheme
   for in-situ PUR
   insulation

   
Duratherm® 25 year
   Insurance Backed
   Guarantee

   
Isothane delighted to be
   involved with the
   Salford Energy Hub
   Project
   
Isothane Awarded BBA
   Certification for
   Duratherm® at ABE
   Ingenuity and
   Innovation in
   Construction Annual
   Conference & Exhibition,
   2010
   
Isothane’s Technical
   Director Ray Herridge
   receives BRUFMA
   Award
   
Isothane launch new
   sustainable insulation
   product
   
Isothane Ltd
   successfully insulates
   762 “Hard to Treat”
   Homes in Rochdale with
   Technitherm®
   
Isothane Limited Joins
   National Insulation
   Association NIA
   Promoting Insulation
   Excellence
   
Isothane makes the
   Sunday Times
   International Track 100
   
Energy Saving Trust
   advises on the use of in-
   situ applied PUR/PIR
   insulation
   
Isothane launches new
   Technitherm® movie
   
Isothane launches new
   Retrofit Insulation
   Brochure
   
New Report Rejects    Condensation Risk of
   In-Situ PUR / PIR    Insulation in Hybrid
   Roofs
   
Technitherm® Cures
   Hard To Treat Homes
   
Flooding - New Building
   Regulations
How to achieve Zero
   Carbon U-values
   
Product Launch -
   Thermadek Winter
   
Replacement of
   Flammable Solvents
  
Isothane win
   RoSPA Award
   

Technitherm® Cures Hard To Treat Homes

BBA-certified and CERT-assessed Technitherm® has been curing Hard To Treat Homes for decades now. The Case Studies below illustrate some of the many aspects that can be solved with Technitherm®. With one application, the best insulation, air tightness and stabilisation is delivered by one product, Technitherm®; whether it is narrow cavities, missing or failed wall ties, water penetration, unstable brickwork or mortar joints, storm damage, weak inner blockwork, the particular difficulties of high rise tower blocks, poorly fitted partial fill boards, etc...

High Rise heating bills reduced by 77% (Edinburgh) No wall ties (Walthamstow) Weak brickwork and mortar joints (Watford)
     

High Rise heating bills reduced by 77% (Edinburgh)

No wall ties (Walthamstow)

Weak brickwork and mortar joints (Watford)

     
High Rise stabilisation and insulation (Liverpool) Timber wall ties (Blackburn) Technitherm® Results for CERT
     

High Rise stabilisation and insulation (Liverpool)

Timber wall ties (Blackburn)

Technitherm® Results for CERT